Ever wanted to see a wetland in action during rain?
Category : Integrated Water
Today we are going to have a look at a video of a constructed integrated water project consisting of flood mitigation, water quality and stormwater harvesting. The video features our Director Adam Berry discussing technical aspects of a previous project at Jim Donald Parklands.
It is important to not walk away from these assets when they are finished construction. Keep an eye on them, learn from them and pass these learnings onto the industry. Mistakes included.
If you would like to see how Synergy can help in this space check out our services offered within the integrated water and wetlands space below